Call for the Provision of Electricity Contract Related Information (Manufacture of Iron and Steel From Iron Sand) Notice 2025
Pursuant to section 161D(1)(e) of the Climate Change Response Act 2002, I, the Honourable Simon Watts, Minister of Climate Change, give the following notice.
(1) This notice may be cited as the Call for the Provision of Electricity Contract Related Information (Manufacture of Iron and Steel from Iron Sand) Notice 2025.
(2) This notice takes effect from and including 16 December 2025.
Unless the context otherwise requires:
Manufacture of iron and steel from iron sand has the meaning given to it in regulation 23(3) of the Climate Change (Eligible Industrial Activities) Regulations 2010 and as undertaken by New Zealand Steel Development Limited.
2016 electricity contract means the electricity related contract between New Zealand Steel Limited and Alinta ENZ Limited (Alinta) dated 6 September 2016.
NZ Steel means the company registered as New Zealand Steel Limited, and relating to the operations carried out by and for New Zealand Steel Limited at Glenbrook.
(1) NZ Steel must provide the Ministry for the Environment, within 30 working days of the date of this notice, with the information specified in paragraphs 3(5)(a) to 3(5)(e) of this notice.
(2) NZ Steel must provide the information specified in paragraphs 3(5)(a) to 3(5)(e) in respect of the activity of manufacturing iron and steel from iron sand and for the period 1 January 2025 to 31 December 2025.
(3) NZ Steel must provide actual values for historic time periods where such information is known.
(4) For time periods in the future, or where such actual information is not known, NZ Steel must provide its best estimate of the most likely values as at the date of this notice.
(5) NZ Steel must provide:
4. NZ Steel may provide any additional information that it believes will assist the Minister in making a determination.
Dated at Wellington this 16th day of December 2025.
Hon SIMON WATTS, Minister of Climate Change.