Land (Subsurface) and a Restrictive Covenant Acquired for Railway Purposes—City Rail Link Project, 15–27 Beresford Square, Auckland Central
Pursuant to the Public Works Act 1981, and to a delegation from the Minister for Land Information, Madison Ingram, Land Information New Zealand, declares pursuant to section 20, and to an agreement to that effect having been entered into:
on the date of publication hereof in the New Zealand Gazette.
| Area ha |
Description |
| 0.0103 | Part Lot 2 DP 523853, (part Record of Title 834657), shown as Section 1 SO 537515 |
| Description | |
| Part Lot 2 DP 523853, (part Record of Title 834657), shown as Area A SO 537515 |
1. Definitions: In this covenant, unless the context indicates otherwise:
Acquisition Boundary means the legal boundary that represents the lower or side boundary of the Covenant Area and the upper or side boundary of the Railway Land;
Burdened Land means part Lot 2 DP 523853 being part Section 2 on SO 537515 (Record of Title 834657)
Covenantee means Auckland Council as registered owner of the Railway Land and includes its successors and assigns and any party which has the authority granted to it or delegated to it or vested in it by contract, or by statute, or by any statutory or non-statutory instrument or otherwise, to exercise the rights and powers of the Covenantee under this covenant;
Covenant Area means that part of the Burdened Land as is shown marked Area A on SO Plan 5375151;
Foundation Load and Embedment Plan means a plan prepared by a suitably qualified engineer that shows the location and depth of piles, and the calculated load supported by the piles and/or foundation elements;
Ground Level means the existing ground level, natural or modified, as at the Notification Date;
Notification Date means 25 January 2013, being the date that the notice of requirement for the Designation was publicly notified;
Owner means the registered owner(s) for the time being of the Burdened Land, and includes the Owner’s successors in title as registered owners of the Burdened Land;
Railway means the railway to be operated within the Railway Tunnels, and includes the railway lines and associated services and infrastructure, and the rail vehicles to be operated on those lines;
Railway Land means the stratum estate in freehold that has been acquired for railway purposes described as Section 1 on SO Plan 537515, being 103m2 more or less;
Railway Tunnels means the railway tunnels and underground stations referred to in background recital B, including all infrastructure associated with the Railway Tunnels, and including all modifications or additions to them at any time;
Restricted Work means any excavation, building, foundations, piles or other work of any nature within the Covenant Area;
Threshold Ground Load Differential means a net change (increase or reduction) in ground load of 50kPa (working) from the ground load (including ground modifications and built structures) that existed at the Notification Date resulting or expected to result from any Restricted Work, as measured at the Acquisition Boundary.
Working Day has the meaning given to it in the Property Law Act 2007.
2. Interpretation: In this covenant, unless the context indicates otherwise:
3. Existing Statutory restrictions: Certain activities above the Railway and the Railway Tunnels may affect the integrity of the Railway Tunnels and the safety of the Railway and users of it. The following existing statutory restrictions apply to such activities:
4. Restricted Work: For better compliance with the existing restrictions recorded in clause 3 above and the better protection of the Railway and the Railway Tunnels, the Owner is prohibited from carrying out any Restricted Work without the prior written consent of the Covenantee under clause 7 below on each occasion and subject to strict compliance with such conditions as the Covenantee may impose on any such consent.
5. Any activity: For the avoidance of doubt, clauses 3 and 4 apply to any activity, whether that activity commences on the surface of the Burdened Land or any other property.
6. Appurtenant to Railway Land: The covenants on the part of the Owner in this covenant are for the benefit of, and are appurtenant to, the Railway Land and every part of the Railway Land.
7. Consent to Restricted Work: The Owner must not carry out, or permit or allow to be carried out, any Restricted Work without first obtaining the Covenantee’s written consent. For that purpose:
8. Foundation Load and Embedment Plan: For the purposes of obtaining the consent of the Covenantee under clause 7, the Owner must give written notice to the Covenantee requesting the Covenantee's consent to the proposed Restricted Work, accompanied by a sufficiently detailed Foundation Load and Embedment Plan, prepared by a suitably qualified engineer, with accompanying specifications and methodology:
9. Consent may be given subject to conditions: If the Covenantee gives its consent under clause 7, such consent may be given subject to such reasonable conditions as the Covenantee may determine. Consent will be required on each occasion notwithstanding any prior consent obtained for the like purpose on a prior occasion.
10. Consent deemed to be given: If the Covenantee gives its consent to Restricted Work under clause 7, consent to the activities constituted by that Restricted Work will be deemed to have been given to the extent they would otherwise breach section 176 or section 178 of the Resource Management Act 1991, section 237 of the Public Works Act 1981 or section 73 of the Railways Act 2005.
11. Drilling within Railway Land: No excavation, building, foundations, piles or other work of any nature may be undertaken by the Owner in the Railway Land:
12. Activities that do not require consent: For the avoidance of doubt, the Owner does not require the consent of the Covenantee to carry out any activities that do not extend into the Covenant Area or the Railway Land.
13. Dispute resolution: In the event of a dispute between the Owner and the Covenantee regarding the assessment of the net change in the ground load resulting or expected to result from any Restricted Work for the purposes of clause 7 and 8, or any other matter relating to the obtaining of any consent required under clauses 7 to 11 inclusive:
14. Costs: The Owner is responsible for the Covenantee’s reasonable costs in respect of obtaining any consents under this covenant, including the considering of any request for consent whether or not the matter proceeds, and all costs of the Owner in the performance and observance by the Owner of the terms and conditions of this covenant.
15. Indemnity: The Owner must fully indemnify the Covenantee and Auckland Council against any claims, loss and expense of whatever kind incurred by the Covenantee or Auckland Council as a consequence of the Owner failing to comply with the provisions of this covenant.
16. Privity: This covenant is intended to be for the benefit of, and enforceable by, the Covenantee for the purposes of section 12 of the Contract and Commercial Law Act 2017.
17. Transferees etc.: This covenant will be binding on all transferees, tenants, lessees, mortgagees, charge-holders and their respective successors in title and assigns of any estate or interest in the Burdened Land.
18. Further Obligations: The Owner must not:
19. Any notice or other communication to be given or served under this agreement must be in writing and will be deemed to be sufficiently given or served (in the absence of proof to the contrary) if it is given or served by any of the following means:
Any notice or other communication served after 5.00pm on a Working Day, or on a day that is not a Working Day, will be deemed to have been served on the following Working Day.
Dated at Christchurch this 26th day of August 2025.
MADISON INGRAM, for the Minister for Land Information.