Notice Title

Land to be Set Apart for Use in Connection With a Road—State Highway 1, Mazengarb to Otihanga Road, Paraparaumu, Kapiti

Publication Date
10 Jan 2024

Tags

Public Works Act Roading Districts Kapiti Coast

Notice Number

2024-ln78
Title
View PDF
File Type and Size
PDF (39 KB)

Pursuant to the Public Works Act 1981, and to a delegation from the Minister for Land Information, Szi Ming Lee, Land Information New Zealand:

  1. Pursuant to section 52(1), declares the land described in the First Schedule to this notice is to be set apart for use in connection with a road (segregation strip)
  2. Pursuant to section 52(1), declares the land described in the Second Schedule to this notice is to be set apart for the functioning indirectly of a road (wetland)

and shall remain vested in the Crown, on the date of publication hereof in the New Zealand Gazette.

Wellington Land District—Kapiti Coast District

First Schedule

Land to be Set Apart for Use in Connection with a Road (Segregation Strips)
Area
ha
Description
0.0053 Part Section 2 SO 419095 shown as Section 17 SO 574970. (Record of Title 904443)
0.0007 Part Section 1 SO 419095 shown as Section 23 SO 574970. (Record of Title 904443)
0.0024 Part Section 1 SO 419095 shown as Section 25 SO 574970. (Record of Title 904443)
0.0015 Part Section 1 SO 419095 (shown as Section 26 SO 574970. (Record of Title 904443)
0.0034 Part Section 1 SO 419095 shown as Section 29 SO 574970. (Record of Title 904443)
0.0066 Part Section 2 SO 419095 shown as Section 30 SO 574970. (Record of Title 904443)

Second Schedule

Land to be Set Apart for Use in the Functioning Indirectly of a Road (Wetland)
Area
ha
Description
0.0054 Part Section 2 SO 419095 shown as Section 31 SO 574970. (Record of Title 904443),

Dated at Wellington this 19th day of December 2023.

SZI MING LEE, for the Minister for Land Information.

(LINZ CPC/2011/16121)