Electricity Industry (Exemption No. 297 (Advanced Metering Services Limited)) Exemption Notice 2021
In accordance with section 11 of the Electricity Industry Act 2010 (“Act”), the Electricity Authority (“Authority”) gives the following notice.
(1)This notice is the Electricity Industry (Exemption No. 297 (Advanced Metering Services Limited)) Exemption Notice 2021.
(2) This notice comes into force on the day after the date it is notified in the New Zealand Gazette.
(1) Advanced Metering Services Limited (“AMS”) is exempted from complying with the obligations in clause 5(b)(xii) of Schedule 10.8 of the Electricity Industry Participation Code 2010 (“Code”) to ensure that the memory and clock of the metering device continues to operate for at least 15 days after power is lost to the device for ARC metering installations, and clause 21 of Schedule 10.7 of the Code which would allow AMS to certify an ARC metering installation that is outside the accuracy tolerances.
(2) This exemption applies only to ARC meters.
This exemption expires at the earlier of:
The reasons for granting this exemption are:
Dated at Wellington this 3rd day of August 2021.