Land Transport Rule: Traffic Control Devices 2004—Two-aspect Roundabout Metering Traffic Signals Trial Amendment
Pursuant to subclause 3.4(1) of the Land Transport Rule: Traffic Control Devices 2004 and a delegation from the NZ Transport Agency, I, Glenn Bunting, Manager Network Safety, make the following amendments to the “Two-aspect Roundabout Metering Traffic Signals trial” notice, published in the New Zealand Gazette, 15 October 2018, Notice No. 2018-au5079:
Road Controlling Authority |
Location |
Approach metered with two aspect traffic signals |
NZ Transport Agency |
State Highway 1 Paremata Roundabout |
State Highway 1, Paremata roundabout (northbound approach) to the roundabout |
Signed at Wellington this 11th day of April 2019.
GLENN BUNTING, Manager Network Safety, NZ Transport Agency.
A new site has been included in this trial. The evaluation requirements of the original trial approval notice apply to the new trial site in order to contribute to the final report for the trial.