Notice Title

Road Stopped and Set Apart for Use in Connection with a Road (Walkway)—Adjoining State Highway 76, Christchurch Southern Motorway, Christchurch

Publication Date
19 May 2016

Tags

Roading Cities Public Works Act Christchurch

Notice Number

2016-ln2727

Issue Number

44
Title
View PDF
File Type and Size
PDF (23 KB)

Pursuant to section 116 of the Public Works Act 1981, and to a delegation from the Minister for Land Information, Jessica Enoka, Land Information New Zealand, declares the road described in the Schedule to this notice to be stopped and, pursuant to section 52(1), set apart for use in connection with a road (walkway) and shall remain vested in the Crown on the date of publication hereof in the New Zealand Gazette.

Canterbury Land District—Christchurch City

Schedule

Road Stopped and Set Apart for Use in Connection With a Road (Walkway)

Area
ha

Description
2.4441 Part State Highway 76; shown as Section 1 on SO 492403.
0.6504 Part State Highway 76; shown as Section 2 on SO 492403.
0.0312 Part State Highway 76; shown as Section 3 on SO 492403.
0.0690 Part State Highway 76; shown as Section 4 on SO 492403.
0.1272 Part State Highway 76; shown as Section 5 on SO 492403.
0.9036 Part State Highway 76; shown as Section 6 on SO 492403.

Dated at Wellington this 12th day of May 2016.

J. ENOKA, for the Minister for Land Information.

(LINZ CPC/2015/18103)