Notice of Adoption of Replacement System Operator Rolling Outage Plan

Publication Date
2 Jun 2016

Tags

Electricity Industry Act Electricity Industry Participation Codes Electricity Authority

Notice Number

2016-au3013

Page Number

4156

Issue Number

50
Title
View PDF
File Type and Size
PDF (22 KB)

Pursuant to clause 5(c) of Schedule 1 of the Electricity Industry Act 2010 (“Act”), I give notice that the Electricity Authority (“Authority”) adopts a replacement system operator rolling outage plan for the purposes of clause 9.3 of the Electricity Industry Participation Code 2010 (“Code”).

  1. The adoption of the replacement system operator rolling outage plan has effect from 19 June 2016.
  2. The replacement system operator rolling outage plan is a document incorporated by reference into the Code as having legal effect in accordance with section 32 of the Act.
  3. A copy of the replacement system operator rolling outage plan and the Code are available on the Authority’s website
    www.ea.govt.nz/code-and-compliance/the-code/
  4. A copy of the replacement system operator rolling outage plan and the Code may also be inspected free of charge or purchased from the Electricity Authority, Level 7, ASB Bank Tower, 2 Hunter Street, Wellington.

Dated at Wellington this 26th day of May 2016.

Dr THOMAS BRENT LAYTON, Chair, Electricity Authority.